MAIN STAGES OF BUILDING

1896-1898 - Origin of Tuapse port 
Building of  the Coast and Roadstead breakwaters

1898-19909 - Formation of a water area Public (Old port)
Building of the Western breakwater and sea-front in the base of  the coast mole.

1909-1917 - Formation of modern harbour area Tuapse
Building of protecting structures of Southwest breakwater and Southern breakwater passenger quay and lengthening of quay in the base of the Coast breakwater. Export of Tuapse river outside the harbour area.

1917-1941 - Development of berthing front and protecting structures.
Building of an oil-loading terminal and Broad mole, Southeast (Pervomayskiy) mole and blocking the Western gate. Excavation of the Roadstead breakwater, formation of the port and urban territories.

1963-1978 - Building and renovation of wharfage.
Building of the oil-loading terminal N 1 and 2, moorings of Ship Repair Yard, Fishing port and Ship Mechanical Yard. Reconstruction of an oil-loading terminal (moorings N 9A-13). Reconstruction of the Station which is cleaning ballast waters and its coastal fortifications. Liquidation Western gate. Export of  Pauk river outside the harbour area.

1978-1998 - Building of  the port and technical fleet moorings, repair of protecting structures.